library
1981. (1986.)
Existing building with shops in ground floor and apartments on the first
floor, on the central town square was converted in the main town library.
It was 1st phase. Non used cellar and attic space should have been added
eventually in 2nd phase. For the first phase all working drawings had been
done, but for second phase only presentation drawings were done. (Another
architect made working drawings) |
|
|
|
|